What Architects Actually Ask Us
- MOSS Objects
- Feb 17
- 1 min read
After hundreds of conversations with architects and interior designers, here is what they really want to know about MOSS.

First question: What is the lead time? Four to six weeks, made-to-order from our Berlin studio. We do not stock inventory. Every piece is fabricated specifically for your project.
Second question: Can we get samples? Yes. We provide material samples for both Copper and Dark Bronze finishes. These are actual production samples, not marketing materials. You see exactly what you will get.
Third question: How does the Dune modularity work? Each Dune element connects via a standardized joint system. You can reconfigure Curve and Cluster arrangements to suit the space. We provide technical drawings and can advise on optimal configurations for your ceiling height and room dimensions.
Fourth question: What about dimming? All our fixtures are compatible with standard phase-cut dimmers. We use high-CRI LED modules with consistent color temperature. No flicker. No color shift.
Fifth question: Do you work directly with architects? Absolutely. We prefer it. Contact us with your project details and we will provide specifications, pricing, and timeline.